Trowl stemwall 1

THE FOUNDATION OF THE OJUSD PAVILION IS LAID.

Install Paneling 3

THE FRAMING OF THE PAVILION IS UP. WE'RE ALMOST THERE.

Transformer 1

ELECTRICAL TECHNICIANS RUN POWER TO THE OJUSD FARM.

20170428_100353

FINISHING TOUCHES ARE PUT ON THE OJUSD PAVILION.

Farm Pavillion 1

THE OJUSD FARM PAVILION IS READY FOR THE 2017-2018 SCHOOL YEAR.

School Farm SD.7

SUPERINTENDENT MARC MALONE SPEAKING TO THE OJUSD STAFF AT THE FIRST DISTRICT-WIDE MEETING AT THE FARM.

School Farm BBQ.3

THE ENTIRE OJUSD STAFF ENJOYS LUNCH TOGETHER AT THE FIRST OJUSD STAFF DEVELOPMENT DAY.

FullSizeRender (1)

AERIAL OF THE OJUSD FARM WITH THE OJUSD PAVILION IN THE FOREGROUND

FullSizeRender

AERIAL OF THE OJUSD FARM WITH THE OJUSD ORCHARD IN THE FOREGROUND

20160726_125342

WP_20170127_16_51_05_Pro

Pac SW Filter-pump Install 2-2-17

School Farm Orchard Planting 4

Micro install 6

Micro install 2

Micro install 4

Mainline PVC in trench

20170127_130138

Hose install team Mar 2017

Mainline 2

Herman float 2

Back Flush and Elec Conduit trench

20170127_121309

20170127_120406

20170127_120146

20160916_114901

20170127_130519

20170127_130138